Arriving at Amortized Cost |
Transaction Price |
− Principal Repayments |
− Cumulative Amortization |
= Gross Carrying Amount |
− Loss Allowance (ALLL) |
= Net Carrying Amount |
A financial asset at amortized cost is initially recognized at its transaction price, which can be above its par value (at a premium), below par value (at a discount) or at par, with any premium or discount amortized into interest income over its term.
The effective interest-rate method is a technique for calculating the actual interest rate in a period based on the carrying value of a financial instrument at the beginning of the accounting period and to amortize the cost of the instrument at a constant rate by allocating the interest revenue or expense at that rate over its life. The effective interest rate (EIR) is the rate that provides a level yield on the financial instrument to its maturity date or next market-based repricing date equal to the rate that exactly discounts the cash flows to the net carrying amount from its initial recognition to its maturity. The original effective interest rate of a financial instrument is its original contractual interest rate adjusted for any deferred fees or cost or any premium or discount at the origination or acquisition of the asset.
The EIR Method for Valuing an Asset | |||||||||||||
PVAsset = CF/(1 + r)n | |||||||||||||
Where: | |||||||||||||
PVAsset | = Present Value of Asset | ||||||||||||
CF | = Estimated Cash Flows | ||||||||||||
r | = Effective Interest Rate | ||||||||||||
t | = Cash Flow Periods | ||||||||||||
n | = Term of Asset | ||||||||||||
|
Under US GAAP, the effective interest rate is computed on the basis of the contractual cash flows over the contractual term. Under IFRS, the EIR is computed on the basis of the estimated cash flows that are expected to be received over the asset’s expected life by considering the contractual terms (e.g., prepayment, call and similar options), excluding expected credit losses. While under US GAAP origination fees, direct origination costs, premiums and discounts are typically amortized over the contractual term, under IFRS they are amortized as part of the calculation of the EIR over the expected life of the asset.
Leave A Comment
You must be logged in to post a comment.